THE OWNER’S NUMBERS / ABOUT 5 MINUTES
Project Margin Stress Test
Before this project eats your profit,
find out what needs to change.
Offline version. Your numbers stay in this file while it is open. Save your results before closing. See my results
Tell us about the job
These are made-up numbers. Change them to match your job.
Check your numbers
Fill in the price, costs, goal and each person’s numbers. Use 0 for costs or hours you do not expect.
YOUR JOB / RESULTS
ESTIMATEYour project brief
What’s left after the work costs
If work goes as planned
—If work takes longer
—After the work costs you entered. A minus sign means the job costs more than you charge. Tax and other business bills may still be due. This is not final profit or cash you can spend.
Jacob’s take
An automatic guide from your answers. Jacob has not reviewed this job.
Want another set of eyes? Let’s talk through a Project Margin Review.
Let’s look at your options
Based on your main plan. Each option works on its own.
A new price needs the client’s OK. Lower costs must still cover the promised work. These are options to check, not promised savings.
See the numbers and math
| What we count | As planned | More hours |
|---|
Each person’s cost = their hours left × their hourly cost. Add those costs together. Total work cost = costs so far + other costs still to come + all people’s costs.
Share left (%) = (price − total work cost) ÷ price × 100. Budget for the hours left = price × (1 − goal ÷ 100) − costs so far − other costs still to come. An hours limit is shown only when everyone has the same hourly cost: budget for the work left ÷ that hourly cost.
Price needed = total work cost ÷ (1 − goal ÷ 100). For a 30% goal, use 30 in these formulas. The cost-cut option lowers total work costs. The price option raises the price with no extra work or cost. Neither requires the other.
Pick your next step
Use a job code if you need one. Leave private names and records out of your notes.
Your saved file includes your numbers and notes. It stays on your device. Nothing is sent to Jacob.
Your numbers
Check the numbers before you act.
Count work already done even if the bill is unpaid. Count each cost once. If hired help is in your other costs, do not add their hours too. If the harder case needs more supplies or other costs, change that box and check again. This tool does not check your records or what you promised the client. It does not work out tax, client bills that never get paid, loan costs, refunds or other jobs. A job can have money left after its work costs while the business still loses money.
This tool helps you plan. Check your costs, hours and client agreement before you act. Read your saved file before you share it.